19" 3U 18slots Chassis Video Data fiber Converter
Rack mount chassis dual power supply
Introduction of video fiber converter
OLYCOM 19'' 3U video converter rack OM1918V is designed to concentrate OM620 series 1~8 channel video optical receiver cards. The play-and-plug design provides great convenience in installation. It can hold 18 pieces of 1~4-ch cards, or 9 pieces of 8-ch cards.
Key Features
- Lightning-proof solution
- Dual power supply
- Robust metal casing
- Hot plug-and-play with switch power supply
- Maximum convenience for centralized control
Specification of optic fiber converter
Slots |
Slots quantity | 18 slots |
Compatibility(with cards) | 1~4ch cards(18pcs); 8ch cards(9pcs) |
Flexibility | Support mixed installation |
Power. Environmental. Mechanical |
Operating voltage | Dual power supply, 220V/-48V |
Operating temperature | -30℃~+75℃ |
Storage temperature | -40℃~+85℃ |
MTBF | ≥ 5*104 hours |
Dimension-standalone | 485(L)*300(W)*135(H) mm |
Weight | 5.12kg/piece (Net Weight), 6.12kg/piece (Gross Weight) |


Application
- Express way security protection and toll station system
- City traffic monitoring system
- Building and campus monitoring system
- Industrial monitoring (airport, chemical plant, railway, etc.)
- Military monitoring (frontier defense, national defense)
- Electronic power oil field, TV station program broadcasting

Production Steps:
- Welding: Weld the necessary components
- Cleaning: To avoid any possible dysfunction due to dust or scraps on the PCB boards.
- Assembling: Builds up components of a product, like panels, screws, PCB boards.
- Testing: To make sure the product is basically working fine after assembling
- Aging: To check if the product can work smoothly for long time without any minors such as LED indicators, voltage. This will usually last for 24 to 48 hours.
- Testing: To test if the product can process data or video signals correctly. Any data loss? Transmission rate correct? Any data packet failure? Such questions would be verified in this procedure.
- QC testing: This is the third and also last check of product quality. If it goes good, our packing staff will pack it up according to customer requirements and attach to the packing box a product label.
- When all above is done, the product will go to market.